C-26 and C-27 P118-23-00 and P118-23-02

Flood risk reduction project within the drainage areas of Tributaries P118-23-00 and Sub-Tributary P118-23-02

Project Description

The goal of this project is to reduce flooding risks by improving the capacity of Halls Bayou Tributary P118-23-00 and Sub-Tributary P118-23-02 to convey stormwater during rain events.

Project Stage

This project is currently undergoing an Alternatives Analysis as part of the PRELIMINARY ENGINEERING stage. This stage of the project will result in a Preliminary Engineering Report with a recommended project that can be taken to Harris County Commissioners Court for approval and then advanced to the DESIGN stage. The PER may identify needed right-of-way acquisition, utility relocation and a preliminary cost estimate.

>Read more about the Project Lifecycle

Location

Tributary P118-23-00 is located just upstream (west) of Hardy Toll Road with an approximate length of 1.5 miles and drainage area of 780 acres. The channel terminates at Canino Road. Sub-tributary P118-23-02 intersects with P118-23-00 near Gulf Bank Road.

BOND PROJECT LISTING

Bond Projects C-26 and C-27 are potential future Partnership projects with the City of Houston and Harris County.

  • The total allocation for all stages of the C-26 P118-23-00 project is currently $16 million on the Bond Project List, of which approximately $14.4 million would be partnership funding, if granted, and $1.6 million would be local costs.
  • The total allocation for all stages of the C-27 P118-23-02 project is currently $12 million on the Bond Project List, of which approximately $10.8 million would be partnership funding, if granted, and $1.2 million would be local costs.

>Read more about the BOND PROJECT LIST

COMMUNITY ENGAGEMENT MEETING

Not yet scheduled

PROJECT MILESTONES        

August 28, 2018 – Harris County Commissioners Court authorized negotiations with an engineering firm to complete a preliminary engineering report in support of this project

August 28, 2018 – Harris County Commissioners Court authorized and initiated this project