Projects & Studies
-
Countywide or Multi-watershed
- Z-01 Countywide Floodplain Preservation and Right of Way Acquisition
- Z-02 Partnership Projects with Municipalities, Authorities, and Other Districts in Harris County
- Z-03 Countywide Ongoing Planning
- Z-04 Partnership Projects with the Harris County Engineering Department
- Z-05 Advanced Emerging Technologies for Flood Damage Reduction
- Z-08 Preliminary Engineering for Large Diameter Tunnels for Stormwater Conveyance
- Z-10 County-wide Floodplain Mapping Update
- Sediment Removal in Precinct 2
- Aquifer Recharge Technology for Drainage Reuse
-
Subdivision Drainage Projects - Harris County Engineering Department
- E-01 Subdivision Drainage Project
- E-02 Subdivision Drainage Project
- E-03 Subdivision Drainage Project
- E-04 Subdivision Drainage Project
- E-06 Subdivision Drainage Project
- E-07 Subdivision Drainage Project
- E-08 Subdivision Drainage Project
- E-09 Subdivision Drainage Project
- E-12 Subdivision Drainage Project
- E-13 Subdivision Drainage Project
- E-14 Subdivision Drainage Project
- E-15 Subdivision Drainage Project
- E-16 Subdivision Drainage Project
- E-17 Subdivision Drainage Project
-
Addicks Reservoir
- Completed Projects
- C-36 Lower South Mayde Creek
- C-37 Little York Stormwater Detention Basin
- C-38 Dinner Creek Stormwater Detention Basin
- C-40 Study of Addicks and Barker Reservoirs
- C-46 Stormwater Detention Basin on South Mayde Creek
- C-48 Stormwater Detention Basin on South Mayde Creek near the Grand Parkway
- F-53 Rehabilitation of Channels Upstream of Addicks Reservoir
- F-54 Upper Langham Creek Frontier Program
- F-55 Bear Creek
- F-56 Detention and Retention Upper Cypress and Addicks
- F-83 Stormwater Detention Basin for the Upper Langham Creek Program
- F-84 Secondary Outfall for John Pauls Landing
- F-112 Wetlands Mitigation Bank
- Addicks Reservoir Watershed Model and Map Update
- Cypress Creek Overflow Management Plan
- Stormwater Detention Basin at John Paul's Landing Park
- Selective Clearing at Addicks Reservoir
-
Armand Bayou
- C-06 La Porte
- C-07 Red Bluff Regional Stormwater Detention Basin
- C-44 Armand Bayou Right-of-Way Acquisition and Floodplain Preservation
- CI-021 Brookglen Flooding Mitigation Analysis
- CI-023 Channel Conveyance Improvements Along Horsepen Bayou and its Tributaries
- F-72 Baywood Stormwater Detention Basin
- Conveyance Improvements on Armand Bayou
- Barker Reservoir
- Brays Bayou
-
Buffalo Bayou
- C-40 and C49 - Study of Addicks and Barker Reservoirs
- CI-014 and F-81 W151-00-00 and W153-00-00
- CI-016 Study to Evaluate Bridges and High-flow Bypasses
- F-58 Linear Detention Between State Highway 6 and Sam Houston Tollway
- F-59 W140-00-00 Spring Branch
- F-82 1119 Commerce Street
- Channel Conveyance Restoration at Buffalo Bayou Park
- Memorial Park Demonstration Project
- W129-00-00 Channel Modifications
- Maintenance Repairs on Buffalo Bayou Tributary W167-04-00
- Carpenters Bayou
- Cedar Bayou
-
Clear Creek
- C-03 Federal Flood Damage Reduction Project - Clear Creek
- C-05 South Belt Stormwater Detention Basin A520-03-00
- CI-001 Rehabilitation of the Clear Creek channel
- CI-003 Rehabilitation of the A214-00-00 channel
- CI-013 Tributary A104-00-00
- CI-039 Partnership Project with Nassau Bay to Reduce the Risk of Flooding
- CI-62 and CI-63 FM 528 and Dixie Farm Road
- F-02 Hughes Stormwater Detention Basin
- F-03 Dagg Stormwater Detention Basin
- F-76 Wetlands Mitigation Bank
- Mud Gully (Beamer Ditch)
- Second Outlet Channel and Gated Structure
-
Cypress Creek
- Completed Projects
- F-20 Cypress Creek Right-of-Way Acquisition and Floodplain Preservation
- F-21 Cypress Creek Tributary K129-00-00
- F-22 Pillot Gully
- F-23 Cypress Creek Tributary K163-00-00 Conveyance Improvements
- F-56 Detention and Retention Upper Cypress and Addicks
- F-88 Stormwater Detention Basins in Large Buyout Areas
- CI-012 Major Maintenance of Cypress Creek and Tributaries
- CI-035 TWDB Regional Drainage Plan
- Cypress Creek Overflow Management Plan
- Katy Prairie Wetlands Construction and Site Improvements
- Meyer Park Archeological Site
- Dry Gully Erosion Repairs K133-00-00
-
Greens Bayou
- C-20 Mid-Reach Greens Bayou Project
- C-31 Smith Road Channel Diversion Project
- C-32 Cutten Stormwater Detention Basin
- C-33 Aldine Westfield Stormwater Detention Basin
- C-34 Lauder Stormwater Detention Basin
- F-40 Lower Greens Bayou Stormwater Detention Basin
- Greens Bayou Wetlands Mitigation Bank
- Glen Forest Stormwater Detention Basin
- Greens Bayou Federal Flood Risk Management Project
- Kuykendahl Stormwater Detention Basin
- Completed Projects
-
Halls Bayou
- C-01 Halls Bayou Tributary P118-26-00 and related Stormwater Detention
- C-02 Aldine Westfield Stormwater Detention Basin and Channel CDBG-DR (2016)
- C-25 Halls Bayou Tributary P118-21-00 and related Stormwater Detention
- C-26 and C-27 P118-23-00 and P118-23-02
- C-28 and C-29 P118-25-00 and P118-25-01
- C-35 Design and Construction of Stormwater Detention Basin and Associated Channel Improvements
- Hall Park Stormwater Detention Basin P518-03-00
- Hunting Bayou
- Jackson Bayou
-
Little Cypress Creek
- Completed Projects
- C-19 Frontier Program Downstream of Cypress Rosehill
- F-26 Little Cypress Creek Frontier Program
- F-27 Zube Park Stormwater Detention Basin
- F-29 Mueschke East Stormwater Detention Basin
- F-30 Schiel Stormwater Detention Basin
- F-31 Cypress Rosehill Stormwater Detention Basin
- F-32 Hegar Stormwater Detention Basin
- F-33 Kleb Woods Stormwater Detention Basin
- F-34 Mason Stormwater Detention Basin
- F-35 Bauer-Hockley Stormwater Detention Basin
- F-89 Additional Volume in Little Cypress Creek Stormwater Detention Basins
- Little Cypress Creek Tributary
- Luce Bayou
- San Jacinto River
- San Jacinto & Galveston Bay
- Sims Bayou
- Spring Creek
- Spring Gully & Goose Creek
- Vince Bayou
-
White Oak Bayou
- C-14 Federal Flood Damage Reduction Project
- C-15 Arbor Oaks Stormwater Detention Basin
- C-16 Design and Construction of Woodland Trails Stormwater Detention Basin
- C-59 Construction of Inwood Forest West Stormwater Detention Basin
- C-60 Construction of Inwood Forest East Stormwater Detention Basin
- CI-011 Feasibility Study Hidden Lake Townhomes
- CI-030 Turkey Gully
- CI-033 General Drainage Improvements along E105-00-00
- F-09 Little White Oak Bayou Channel Conveyance Improvements
- F-10 Brickhouse Gully
- Inwood Forest Stormwater Detention Project
- Lower White Oak Bayou Channel Restoration Study
- Completed Projects
- Fairbanks-North Houston Stormwater Detention Basin (North)
- Willow Creek
ALL SUBDIVISION DRAINAGE IMPROVEMENT PROJECTS AND THEIR RESPECTIVE COMMUNITY ENGAGEMENT MEETINGS ARE COORDINATED AND MANAGED BY THE HARRIS COUNTY ENGINEERING DEPARTMENT. |
---|
E-17 Subdivision Drainage Project
Neighborhood(s) under this Bond ID include but is/are not limited to:
Ravensway South (meeting 2/26/19)
Westgate (meeting 2/26/19)
Tower Oaks Plaza (meeting 3/5/19)
Cypress Crossing Mobile Home Park (meeting 3/5/19)
Wortham
Barwood (meeting 1/30/19) | > Download Meeting Presentation
Tower Oaks Meadows (meeting 1/30/19) | > Download Meeting Presentation
Bernadine Estates (meeting 1/30/19) | > Download Meeting Presentation
A Community Engagement Meeting has been scheduled for:
Ravensway South
Westgate
Tuesday, February 26, 2019, from 6:30 p.m. – 8 p.m.
Cypress Exhibit Center
11026 Telge Road
Cypress, TX 77429
> Scheduled Community Engagement Meetings
Subdivision drainage projects improve the internal drainage systems and related infrastructure that convey stormwater from neighborhoods to major drainage channels or bayous maintained by the Flood Control District. Internal drainage systems include underground storm sewer systems and roadside ditches, and are typically the responsibility of the underlying municipality, utility district and/or Harris County in unincorporated areas.
Harris County Engineering Department will be developing drainage improvement recommendations, conducting community outreach meetings, and preparing preliminary engineering reports to support the advancement of these projects toward final design and construction. A total of 104 subdivision projects have been identified as part of the bond program. Additional projects will be listed here as they are authorized by Harris County Commissioners Court.
> Learn more about Harris County Engineering Department
Elected official directories
Harris County
http://www.harriscountytx.gov/County-Judge-and-Commissioners/Harris-County-Elected-Officials
Texas
https://www.txdirectory.com/online/txsenate/
https://www.txdirectory.com/online/txhouse/
U.S.
https://www.usa.gov/elected-officials/
US Army Corps of Engineers
https://www.swg.usace.army.mil/Contact/