Subdivision Drainage Projects

Subdivision Drainage Projects
Menu

Drainage Projects

Seal of the Harris County Engineering DepartmentDrainage projects managed by the Harris County Engineering Department improve the internal drainage systems and related infrastructure that convey stormwater from neighborhoods to major drainage channels or bayous maintained by the Flood Control District. Internal drainage systems include underground storm sewer systems and roadside ditches, and are typically the responsibility of the underlying municipality, utility district and/or Harris County in unincorporated areas.

The Harris County Engineering Department develops drainage improvement recommendations, conducts community outreach meetings, and prepares preliminary engineering reports to support the advancement of these projects toward final design and construction.

Recovery and Resiliency Division Drainage Improvement Projects

Click the PDF icon for updates on the Harris County Engineering Department – Recovery and Resiliency Division Drainage Improvement Projects.

Active drainage Projects

Below are projects identified as part of the 2018 Bond Program. These projects are listed in alphabetical order, by subdivision, below.

A – E

Aberdeen Green
Airline Estates
Almeda Heights
Apache Land
Barker Lake
Barrett Station
Barwood
Baybrook Subdivision
Bear Creek Village
Beaumont Place
Beaumont Place Subdivision Drainage Improvement Project
Bernadine Estates
Blue Bell
Bridgewater Village and Enclave at Bridgewater
Castlewood
Castlewood (2021 Construction)
Cedar Bayou Park East/West
Cimarron
Coles Crossing
Copperfield Southdown Village Sec. 1
Creekstone
Creel Country
Crosby MUD/Township
Cypress Creek Estates
Cypress Crossing Mobile Home Park
Dowdell Woods U/R (William Dowdell Rd)
Eastex Freeway Subdivision Drainage Project
Evergreen Villas

F – J

Fairway West Sec. 1
Forest Shadows
Fountainhead Sec. 2
Foxwood
Hearthstone Green Sec. 1
Hearthstone Meadows Sec. 1
Hearthstone Ice. 1/Avila Ct Estates
Hidden Meadow
Houmont Park

K – O

Kolbe Road & Related Infrastructure
Bond ID: E-17
Project ID: E100-00-00-HC003
UPIN: 19103MF16601
Precinct: 3
Current Stage: Study
Next Stage: Design
Construction Start: Winter 2022
Latest Meeting: 5/23/2019
Long Play
Longwood Village
Lynwood Estates
Meadow Hill run
Meadow Lake Tract A
Memorial Hills
Memorial Parkway
Norchester
North Forest
North Park Forest
Northfield Place and Oak Glen Place
Northlake Forest

P – T

Parkway Forest
Parkway Mobile Homes
Pine Trails
Prado Woods
Prestonwood Forest
Ralston Acres
Ravensway
Ravensway South
Riata Ranch
Riata West
Rock Creek
Roland Road & Related Infrastructure
Sandpiper / Sandpiper Village
Sawmill Ranch
Seascape Subdivision
Sierra Ranch
Skeetville
Sterling Forest
Stone Gate
Stone Gate Amend
Stone Lake
Stone Ridge
Stonefield Terrace Sec. 3
Tall Pines Addition
Timberlake Estates
Todville Road Bridge & Related Infrastructure
Tower Oaks Meadows
Tower Oaks Plaza

U – Z

WCID 50 Drainage Improvement Project
Westfield Pines
Westfield Village and Westfield Pines
Westgate
Williamsburg Colony
Williamsburg Hamlet
Williamsburg Parish
Williamsburg Settlement