Project Description
The F-95 Tributary C144-00-00 Conveyance Improvements project seeks to reduce flood risks to the neighborhoods adjacent to C144-00-00, a tributary of Sims Bayou, between Fuqua St and Beltway 8. A feasibility study completed in 2020 analyzed flooding occurring near C144-00-00 and recommended the following improvements for Preliminary Engineering to reduce flooding risks:
- Design and construct an additional culvert in conjunction with the Harris County Engineering Department
- Determine required mitigating detention volume downstream of Anderson Road
- Determine right-of-way needs
- Design and construct a detention basin
- Establishment of turf and landscaping