Neighborhood(s) under this Bond ID include, but is/are not limited to:

North Park Forest (meeting 1/28/19) | > Download Presentation | > Download Summary
Memorial Hills (meeting 2/12/19) | > Download Presentation | > Download Summary
Ravensway (meeting 2/26/19) | > Download Presentation |  > Download Summary
Forest Shadows (meeting 3/4/19)| > Download Presentation  | > Download Summary
Sandpiper/Sandpiper Village (meeting 3/4/19) | > Download Presentation  | > Download Summary
Cypress Creek Estates (meeting 3/5/19)| > Download Presentation > Download Summary
Dowdell Woods U/R (William Dowdell Rd)(meeting 3/5/19) | > Download Presentation | > Download Summary
Coles Crossing (community meeting 3/28/19) | > Download Presentation 
> Download Summary
Foxwood (meeting 4/16/19) | > Download Presentation | > Download Summary
Prestonwood Forest (meeting 4/17/19) | > Download Presentation  | > Download Summary
Norchester (meeting 4/17/19) | > Download Presentation  | > Download Summary
Sawmill Ranch (meeting 4/18/19) | > Download Presentation | > Download Summary
Meadow Hill Run (meeting 5/6/19) | >Download Presentation | > Download Summary
Prado Woods (meeting 5/20/19) | > Download Presentation | > Download Summary
Tall Pines Addition (meeting 5/20/19) | > Download Presentation | > Download Summary
Lynwood Estates (meeting 5/30/19) | > Download Presentation  | > Download Summary
Timberlake Estates (meeting 8/20/19) | > Download Presentation | > Download Summary
Stone Ridge (meeting 8/21/19) | > Download Presentation | > Download Summary

Project Description

Subdivision drainage projects improve the internal drainage systems and related infrastructure that convey stormwater from neighborhoods to major drainage channels or bayous maintained by the Flood Control District. Internal drainage systems include underground storm sewer systems and roadside ditches, and are typically the responsibility of the underlying municipality, utility district and/or Harris County in unincorporated areas. 

Learn more about Harris County Engineering Department

Harris County Engineering Department will be developing drainage improvement recommendations, conducting community outreach meetings, and preparing preliminary engineering reports to support the advancement of these projects toward final design and construction. A total of 105 subdivision projects have been identified as part of the bond program.