E-09 Subdivision Drainage Project

E-09 Subdivision Drainage Project

Last Modified: 05/20/2020 01:25 PM

Menu
Northfield Place and Oak Glen Place (meeting 9/17/19) > Download Presentation > Download Summary  
> Download Oak Glen Presentation 

Beaumont Place (9/11/19) | > Download Summary > Download Presentation
Castlewood (9/10/19)  Sec. 1&2 | > Download Summary > Download Presentation
Airline Estates (meeting 1/17/19) | > Download Presentation | > Download Summary
Blue Bell (meeting 1/17/19) | > Download Presentation | > Download Summary
Sierra Ranch (meeting 1/23/19) | > Download Presentation | > Download Summary
Stonefield Terrace Sec. 3 (meeting 1/23/19) | > Download Presentation | > Download Summary
Parkway Forest (meeting 2/26/19) | > Download Presentation | > Download Summary
Evergreen Villas (meeting 3/4/19) |  > Download Presentation | > Download Summary
Hidden Meadow (meeting 3/4/19) |  > Download Presentation | > Download Summary
Houmont Park (meeting 3/18/19) |  > Download Presentation | > Download Summary
Pine Trails (meeting 3/21/19) |  > Download Presentation | > Download Summary
Fountainhead Sec. 2 (meeting 4/10/19) | > Download Presentation | > Download Summary
North Forest (meeting 4/15/19)> Download Presentation | > Download Summary
Ralston Acres (5/15/19) | > Download Presentation  | > Download Summary
Parkway Mobile Homes (9/11/19) | > Download Presentation 

Project Description

Subdivision drainage projects improve the internal drainage systems and related infrastructure that convey stormwater from neighborhoods to major drainage channels or bayous maintained by the Flood Control District. Internal drainage systems include underground storm sewer systems and roadside ditches, and are typically the responsibility of the underlying municipality, utility district and/or Harris County in unincorporated areas. 

Learn more about Harris County Engineering Department

Harris County Engineering Department will be developing drainage improvement recommendations, conducting community outreach meetings, and preparing preliminary engineering reports to support the advancement of these projects toward final design and construction. A total of 105 subdivision projects have been identified as part of the bond program.