Projects & Studies

C-59 Construction of Inwood Forest West Stormwater Detention BasinĀ 

Project Description

Design and construction of this project and Inwood Forest East Stormwater Detention Basin could reduce the risk of flooding for over 950 structures in the 1% floodplain. Project will be coordinated with existing COH plans.