Projects & Studies

As of 03/27/2019

C-59 Construction of Inwood Forest West Stormwater Detention BasinĀ 

Project Description

Design and construction of this project and Inwood Forest East Stormwater Detention Basin could reduce the risk of flooding for over 950 structures in the 1% floodplain.

>Read more about this project