Projects & Studies

As of 09/07/2016

September 25, 2014 Public Meeting

At the end of the study effort, the Harris County Flood Control District held its third public meeting on the Cypress Creek Overflow Management Plan study effort on September 25, 2014 to present study findings and the draft Cypress Creek Overflow Management Plan report, which was submitted to the Texas Water Development Board (TWBD) at the end of October 2014. The Flood Control District accepted comments from the public on the draft report through October 25, 2014.

Materials from the public meeting, including the newspaper notice, meeting presentation, and meeting transcript, can be downloaded by clicking on the links below.

 

> Newspaper Notice

> Meeting Presentation

> Meeting Transcript