Projects & Studies

As of 02/13/2019

 

RECENT ACTION: November 13, 2018 – Harris County Commissioners Court authorized negotiations with an engineering firm for preliminary engineering services in support of this project.

C-46 Stormwater Detention Basin on S. Mayde Creek

Project Description

This project includes right-of-way acquisition, design and construction of a stormwater detention basin, HCFCD Unit U501-06-00, on South Mayde Creek. Stormwater detention basins reduce flooding risks and damages during heavy rain events by safely storing excess stormwater and slowly releasing it back to the bayou when the threat of flooding has passed.

LOCATION

This project will be located near South Mayde Creek in the Addicks Reservoir watershed of northwest Harris County.

Project STAGE

This project is currently in the PRELIMINARY ENGINEERING stage. This stage of the project will result in a recommended project that can be taken to Harris County Commissioners Court for approval and then advanced to the DESIGN stage.

>Read more about the PROJECT LIFECYCLE

BOND PROJECT LISTING

Bond Project C-46 is a potential “Partnership” project. Total allocation for this multi-stage project is currently $16 million on the Bond Project List, of which an estimated $14.4 million would be partnership funding, if granted by a partnership agency, and $1.6 million would be local costs. If partnership funds are not available, the project will be funded totally from the 2018 Bond Program as a “Local Only” project.

>Read more about the BOND PROJECT LIST

COMMUNITY ENGAGEMENT MEETING

Not yet scheduled

PROJECT MILESTONES

September 25, 2018 – Harris County Commissioners Court authorized and initiated this project