Horsepen Creek Maintenance Project

This maintenance project (U106-00-00-X024) removed accumulated sediment along a 3.25-mile section of Horsepen Creek from State Highway 6 downstream to the Addicks Reservoir. The project addressed spot erosion and pipe repairs along sections of the creek’s side slopes to help reduce the amount of eroded soil that falls into Horsepen Creek. The project was completed in late 2012 at a cost of approximately $1.4 million.