Cutten Stormwater Detention Basin

HCFCD Unit P500-02-00

The Cutten Stormwater Detention Basin is located on a 235-acre site near Cutten Road and State Highway 249. The portion of the detention basin located south of Greens Bayou is functional and can detain stormwater during large rainfall events. In March 2013, the Flood Control District began an E&R project to remove additional soil from the southern portion of the basin. The Flood Control District also began an E&R project in February 2013 to remove soil from the portion of the detention basin north of Greens Bayou. The final design and construction of the detention basin is not currently funded.