Construction activities include contractor mobilization, initial site preparation, and other related work. Construction crews will be accessing the site on both sides of Genoa Red Bluff, south of Fairmont Parkway and north of Red Bluff Road.
About this Project
The Genoa Red Bluff Regional Stormwater Detention Basin – Phase 2 project will construct two dry-bottom compartments on approximately 227 acres. A stormwater detention basin temporarily holds stormwater during heavy rain events to help reduce the risk of flooding in the area.
The stormwater detention basin is designed to hold approximately 1,100 acre-feet of stormwater. That is roughly the equivalent of covering 1,100 football fields with one foot of water.
Learn more about this project
Funding
- This project is receiving funding up to $53.1 million through the Community Development Block Grant, provided by the U.S. Department of Housing and Urban Development and administered by the Texas General Land Office.
- The 2018 Bond Program contributed approximately $1.9 million towards the design of this project.
- The construction contract was awarded for $42.6 million.
Project Location
The project is located in the City of Pasadena, south of West Fairmont Parkway and east of Red Bluff Road.
Anticipated Schedule
- Construction Start: Q3 2026
- Construction Completion: Q4 2027
The Flood Control District thanks our federal, state, and local partners for helping make flood risk reduction projects like this possible across the Armand Bayou watershed.