Z100-00-00-X295 is a collection of major maintenance projects that will repair various types of channel failures along 56 sites within the San Jacinto River, Hunting Bayou, Carpenters Bayou, Greens Bayou, and Cedar Bayou watersheds. Portions of the identified channels are considered to be in serious failure and these repairs are necessary to prevent further impact on the channels. 

In order to restore channel conveyance capacity to its original design, excavation may widen some channel sections beyond their current condition.

Projects that fall under Z100-00-00-X295 include:

San Jacinto Watershed Repairs

G104-08-00-X001 consists of repairs at two (2) locations: 

 - Site 5787 consists of filling voids beneath concrete channel lining beginning approximately 700 feet east of Luella Ave. 

 - Site 5788 consists of filling voids beneath concrete channel lining beginning approximately 725 feet east of Luella Ave.

G110-00-00-X006 consists of repairs at five (5) locations: 

- Site 5811 consists of concrete channel lining panel replacement beginning approximately 800 feet northwest of Bearle St.

- Site 5816 consists of wingwall replacement beginning approximately 20 feet northwest of Thomas Ave.

- Site 5817 consists of concrete channel lining panel replacement beginning approximately 35 feet northwest of Thomas Ave.

- Site 5818 consists of concrete channel lining replacement beginning approximately 35 feet northwest of Thomas Ave.

- Site 5820 consists of concrete channel lining panel and wingwall replacement beginning approximately 15 feet southeast of Burke Rd.

Hunting Bayou Watershed Repairs

H102-00-00-X009 consists of repairs at one (1) location:

- Site 5722 consists of concrete panel replacement beginning approximately 1300 feet west of Mercury Dr.

H102-02-00-X001 consists of repairs at one (1) location:

- Site 5723 consists of concrete panel replacement beginning approximately 1450 feet west of Mercury Dr.

H102-00-00-X010 consists of repairs at six (6) locations:

- Site 5694 consists of concrete channel lining panel replacement and pipe replacement beginning approximately 350 feet east of Holland Ave.

- Site 5697 consists of concrete channel lining panel replacement beginning approximately 250 feet west of Holland Ave.

- Site 5699 consists of concrete channel lining panel replacement beginning approximately 800 feet west of Holland Ave.

- Site 5703 consists of concrete channel lining panel replacement, pipe replacement, and fill of eroded areas along the outfall pipe beginning approximately 950 feet west of Holland Ave.

- Site 5706 consists of concrete channel lining panel replacement beginning approximately 1400 feet west of Holland Ave.

- Site 5708 consists of filling voids beneath concrete channel lining beginning approximately 1700 feet west of Holland Ave.

H110-00-00-X008 consists of repairs at one (1) location:

- Site 5756 consists of filling voids beneath concrete channel lining beginning approximately 25 feet south of Cavalcade St.

Carpenters Bayou Watershed Repairs

N100-00-00-X033 consists of repairs at one (1) location: 

 - Site 6896 consists of removing concrete slope paving, replacement of a storm sewer outfall, installation of a timber bent, and placement of riprap beginning approximately 525 feet east of Sam Houston Pkwy. 

N109-01-00-X001 consists of repairs at one (1) location: 

 - Site 5661 consists of filling voids beneath concrete channel lining beginning approximately 450 feet east of Overbluff St.  

N109-00-00-X009 consists of repairs at ten (10) locations: 

 - Site 5659 consists of concrete channel lining panel replacement beginning approximately 3700 feet west of Delldale Blvd. 

 - Site 5660 Fill voids beneath concrete panel beginning approximately 400 feet west of Delldale Blvd. 

 - Site 5663 consists of concrete channel lining replacement and pipe beginning approximately 3350 feet west of Delldale Blvd. 

 - Site 5665 consists of filling voids beneath concrete channel lining beginning approximately 2000 feet west of Delldale Blvd. 

 - Site 5666 consists of concrete channel lining panel replacement beginning approximately 2000 feet west of Delldale Blvd. 

 - Site 5668 consists of concrete channel lining panel replacement beginning approximately 1250 feet west of Delldale Blvd. 

 - Site 5670 consists of concrete channel lining panel replacement and pipe replacement beginning approximately 750 feet west of Delldale Blvd. 

 - Site 5671 consists of filling voids beneath concrete channel lining beginning approximately 200 feet west of Delldale Blvd. 

 - Site 5677 consists of filling voids beneath concrete channel lining beginning approximately 130 feet east of Delldale Blvd. 

 - Site 5678 consists of filling voids beneath concrete channel lining beginning approximately 350 feet west of Delldale Blvd.

Greens Bayou Watershed Repairs

P102-00-00-X006 consists of repairs at one (1) location: 

 - Site 5324 consists of channel scour and slope repair, reestablishment of channel toelines, and rebuilding side slopes beginning approximately 1450 feet west of Haden Rd.  

P105-00-00-X010 consists of repairs at three (3) locations: 

 - Site 5196 consists of removal and replacement of an interceptor structure and pipe, backfilling and grading eroded portions of the channel bank, and regrading backslope drainage system swales beginning approximately 825 feet south of Woodforest Blvd. 

 - Site 5197 consists of toe erosion repair including reestablishing the channel toeline and rebuilding side slopes beginning approximately 825 feet south of Woodforest Blvd. 

 - Site 5200 consists of removal and replacement of an interceptor structure and pipe, backfilling and grading eroded portions of the channel bank, and regrading backslope drainage system swales beginning approximately 1250 feet south of Woodforest Blvd.  

P107-00-00-X018 consists of repairs at one (1) location: 

 - Site 5109 consists of removal of a failed inlet structure, installation of an interceptor structure and drop structure, removal and replacement of pipe, and backfilling and regrading the site beginning approximately 500 feet west of Uvalde Road. 

P107-00-00-X019 consists of repairs at five (5) locations: 

 - Site 226 consists of removal and replacement of a storm sewer inlet beginning approximately 200 feet north of Wallisville Rd. 

 - Site 5125 consists of removal of failed reinforced concrete box and installation of a drop structure and pipe beginning approximately 600 feet north of Wallisville Rd. 

 - Site 5126 consists of slope erosion repair including rebuilding side slopes beginning approximately 150 feet north of Wallisville Rd. 

 - Site 5128 consists of removal and replacement of an interceptor structure and pipe beginning approximately 300 feet north of Wallisville Rd. 

 - Site 5129 consists of erosion repair consisting of reestablishing the channel toelines and rebuilding the side slopes beginning approximately 800 feet west of Uvalde Rd. 

P118-05-00-X004 consists of repairs at one (1) location: 

 - Site 4754 consists of toe erosion repair including reestablishing the channel toelines and rebuilding the side slopes beginning approximately 25 feet north of Carolwood Dr. 

P121-01-00-X008 consists of repairs at three (3) locations: 

 - Site 228 consists of removal and replacement of an interceptor structure and pipe and backfilling and grading to match existing grades beginning approximately 1050 feet south of N Sam Houston Pkwy E. 

 - Site 4606 consists of slope erosion repair including rebuilding side slopes beginning approximately 1050 feet south of N Sam Houston Pkwy E. 

 - Site 4607 consists of deep plowing and rebuilding the channel side slopes beginning approximately 2100 feet south of N Sam Houston Pkwy E. 

P121-00-00-X014 consists of repairs at four (4) locations: 

 - Site 271 consists of slope erosion repair including rebuilding side slopes beginning approximately 3550 feet east of CE King Pkwy.

 - Site 382 consists of removal and replacement of an interceptor structure and pipe as well as backfilling and regrading beginning approximately 1650 feet west of N Sam Houston Pkwy E. 

 - Site 4609 consists of removal and replacement of an interceptor structure and pipe beginning approximately 1000 feet west of N Sam Houston Pkwy E.

 - Site 4611 consists of removal and replacement of an interceptor structure and pipe beginning approximately 1000 feet west of N Sam Houston Pkwy E.

P125-00-00-X005 consists of repairs at three (3) locations:

 - Site 4488 consists of installation of a manhole to tie into an existing outfall pipe and installation of pipe as well as storm sewer outfall pipe replacement and slope erosion repair beginning approximately 950 feet west of Mesa Dr.

 - Site 4542 consists of slope failure repair including excavation of sloughed material and rebuilding channel side slopes beginning approximately 200 feet east of Mesa Dr.

 - Site 4545 consists of removal and replacement of a pipe and regrading backslope drainage system swales beginning approximately 500 feet east of Mesa Dr.

Cedar Bayou Watershed Repairs

Q105-00-00-X005 consists of repairs at one (1) location:

- Site 929 slope failure repair beginning approximately 50 feet northwest of Kilgore Rd.

Q112-00-00-X020 consist of repairs at six (6) locations:

- Site 970 consists of erosion repair including rebuilding side slopes beginning approximately 250 feet southeast of Sjolander Dr.

- Site 6976 consists of removal and replacement of an interceptor structure and pipe beginning approximately 900 feet northwest of E Cedar Bayou Lynchburg Rd.

- Site 6979 consists of toe erosion repair including reestablishment of channel toelines and rebuilding channel side slopes beginning approximately 900 feet northwest of E Cedar Bayou Lynchburg Rd.

- Site 6986 consists of removal and replacement of an interceptor structure and pipe and backfilling and regrading beginning approximately 2700 feet northwest of E Cedar Bayou Lynchburg Rd.

- Site 10325 consists of removal and replacement of an interceptor structure and pipe beginning approximately 250 feet southeast of Sjolander Dr.

- Site 10339 consists of toe erosion repair including reestablishing channel toelines, rebuilding channel slopes, and installation of riprap beginning approximately 2400 feet northwest of E Cedar Bayou Lynchburg Rd.

The total cost for these channel repairs is expected to be approximately $1.3M and will be funded using grants from the Natural Resources Conservation Service and the Federal Emergency Management Agency.

There will be heavy machinery near project sites and substantial vegetation removal operations may be needed in order to properly prepare the site for construction. For public safety reasons, if there are trails in the project area, users can expect intermittent closures as the projects progress. Please pay attention to posted signage in the project areas.

Construction has already begun at some of the project sites, but anticipated completion for all sites is Summer 2020 depending on the weather.