Projects & Studies

As of 04/08/2019
ALL SUBDIVISION DRAINAGE IMPROVEMENT PROJECTS AND THEIR RESPECTIVE COMMUNITY ENGAGEMENT MEETINGS ARE COORDINATED AND MANAGED BY THE HARRIS COUNTY ENGINEERING DEPARTMENT.

E-05 Subdivision Drainage Project

Neighborhood(s) under this Bond ID include but is/are not limited to:

Almeda Heights (meeting 5/8/19)

> Scheduled Community Engagement Meetings 

Subdivision drainage projects improve the internal drainage systems and related infrastructure that convey stormwater from neighborhoods to major drainage channels or bayous maintained by the Flood Control District. Internal drainage systems include underground storm sewer systems and roadside ditches, and are typically the responsibility of the underlying municipality, utility district and/or Harris County in unincorporated areas.

Harris County Engineering Department will be developing drainage improvement recommendations, conducting community outreach meetings, and preparing preliminary engineering reports to support the advancement of these projects toward final design and construction. A total of 104 subdivision projects have been identified as part of the bond program. Additional projects will be listed here as they are authorized by Harris County Commissioners Court.

> Learn more about Harris County Engineering Department

Elected official directories

Harris County
http://www.harriscountytx.gov/County-Judge-and-Commissioners/Harris-County-Elected-Officials

Texas
https://www.txdirectory.com/online/txsenate/
https://www.txdirectory.com/online/txhouse/

U.S.
https://www.usa.gov/elected-officials/

US Army Corps of Engineers
https://www.swg.usace.army.mil/Contact/